  • Extremely cheap per kilowatt? Every statistic out there that I’ve seen and that includes government funding, as well as construction and deconstruction costs, paints a different picture. Nuclear is only competitive with coal or the relatively underdeveloped solar thermal.

    In 2017 the US EIA published figures for the average levelized costs per unit of output (LCOE) for generating technologies to be brought online in 2022, as modelled for its Annual Energy Outlook. These show: advanced nuclear, 9.9 ¢/kWh; natural gas, 5.7-10.9 ¢/kWh (depending on technology); and coal with 90% carbon sequestration, 12.3 ¢/kWh (rising to 14 ¢/kWh at 30%). Among the non-dispatchable technologies, LCOE estimates vary widely: wind onshore, 5.2 ¢/kWh; solar PV, 6.7 ¢/kWh; offshore wind, 14.6 ¢/kWh; and solar thermal, 18.4 ¢/kWh.

    Emphasis mine, source: https://world-nuclear.org/information-library/economic-aspects/economics-of-nuclear-power


















  • Everyone keeps saying that but I just can’t see it. The only time my mails were rejected was because I didn’t know what I was doing at the beginning of my journey. Now, whenever I changed my stack or did some major updates the past 20 years or so, I just go to 2-3 sites that analyze my mail server from the outside and tell me if there is anything wrong. The free tier is always more than enough. Just make sure there is at least one service in the list where you send an email to a generated mailbox and have it analyzed. Just looking at the mail server is not enough to find all potential configuration issues.

    I aim at a100% score. It’s time consuming the first time around but later it’s just a breeze.